Vancouver, BC, April 09, 2024 (GLOBE NEWSWIRE) -- Rockridge Resources Ltd. (TSX-V: ROCK) (OTCQB: RRRLF) (Frankfurt: RR0) (“Rockridge” or the “Company”) is pleased to announce that it has received an Exploration Permit for its 100% owned Knife Lake Copper Project located in Saskatchewan, Canada (the “Knife Lake Project” or “Property”). The permit provides for exploration activities to be conducted over a 3-year period. The Knife Lake Project, consisting of 82 claims totaling 56,865 hectares (140,516 acres), is an advanced-stage copper, silver, zinc and cobalt exploration property in Saskatchewan host to the Knife Lake Deposit.

Knife Lake VMS Project Location Map:

https://www.rockridgeresourcesltd.com/_resources/images/Knife-Lake-Region-20210331-003.jpg

Specifically, the permit covers mineral exploration activities including prospecting, mapping, ground/airborne geophysical surveys, drilling up to 70 drill holes, and storing core. The Company has begun planning for future exploration and drill programs at the Project.

Rockridge CEO, Jon Wiesblatt, states, "This has been very timely with the recent and current increase in copper prices and demand globally. It will be great to leverage off the current bull market on copper and we are fully prepared and ready. We have identified some key targets for further exploration and we are planning future drilling at the high-grade Knife Lake Project."

Knife Lake Geology and History: 

The Knife Lake Deposit is interpreted to be a remobilized VMS deposit. The stratabound mineralized zone is approximately 15m thick and contains copper, silver, zinc, gold and cobalt mineralization which dips 30° to 50° eastward over a known strike-length within Rockridge’s claim area of 3,700 metres, and a known average down-dip extension of approximately 300 metres.

Knife Lake Deposit Map:

https://www.rockridgeresourcesltd.com/_resources/projects/KnifeLake-Fig2.jpg

The deposit is hosted by felsic to intermediate volcanic and volcaniclastic rocks which have been metamorphosed to upper amphibolite facies. The deposit contains VMS mineralogy which has been significantly modified and partially remobilized during the emplacement of granitic rocks. The mineralization straddles the boundary between two rock units and occurs on both limbs of an interpreted overturned fold.

The Company completed twenty-four holes consisting of 3,096 metres of diamond drilling in the 2019 and 2021 winter drilling programs. This represented the first drilling on the property since 2001. Both programs have given the Company’s technical team valuable insights into the property geology, alteration, and mineralization that will be applied to future regional exploration on the highly prospective and underexplored land package.  

Knife Lake VTEM and Grab Sample Survey:

https://www.rockridgeresourcesltd.com/_resources/maps/KF-FieldResults-20220110.png

Highlights from the drill programs include previously reported hole KF19003 which intersected net-textured to semi-massive sulphide mineralization from 11.2m to 48.8m downhole. This 37.6 metre interval returned 2.03% Cu, 0.19 g/t Au, 9.88 g/t Ag, 0.36% Zn, and 0.01% Co for an estimated 2.42% CuEq.

In August 2019, Rockridge announced a maiden NI 43-101 resource estimate for the Knife Lake deposit which consisted of a pit-constrained indicated resource of 3.8 million tonnes at 1.02% CuEq and an inferred resource of 7.9 million tonnes at 0.67% CuEq using a 0.4% CuEq cut-off. For more information, please refer to the News Release dated August 14th, 2019 or the NI 43-101 Technical Report on the Mineral Resource Estimate for the Knife Lake Property, Saskatchewan dated September 27, 2019, filed on Sedar.

Qualified Person:

Kerry Bates, P. Geo., a “qualified person” for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects, and a Geologist employed by Eagle Plains Resources, has reviewed and approved the scientific and technical disclosure in this news release relating to the Knife Lake Project.

About Rockridge Resources Ltd.:

Rockridge Resources is a public mineral exploration company focused on the acquisition, exploration and development of mineral resource properties in Canada, specifically copper and gold. The Company’s 100% owned Knife Lake Project is located in Saskatchewan which is ranked as a top mining jurisdiction in the world by the Fraser Institute. The project hosts the Knife Lake Deposit, which is a VMS, near-surface Cu-Co-Au-Ag-Zn deposit open along strike and at depth. There is strong discovery potential in and around the deposit area as well as at regional targets on the large property package.

The Company's gold asset is its 100% owned Raney Gold Project, which is a high-grade gold exploration project located in the same greenstone belt that hosts the world class Timmins and Kirkland Lake lode gold mining camps. Recently reported drill hole RN 20-06 intersected 28.0 g/t gold over 6.0 metres at a shallow vertical level of 95 metres, which is the best result from the project thus far. Rockridge’s goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

Knife Lake Copper Project Location Map:

https://www.rockridgeresourcesltd.com/_resources/projects/KnifeLake-Fig1.jpg

Additional information about Rockridge Resources and its project portfolio can be found on the Company’s website at www.rockridgeresourcesltd.com.

Rockridge Resources Ltd.

“Jonathan Wiesblatt”

    

Jonathan Wiesblatt

CEO

For further information contact myself or:

Jordan Trimble, President or

Nicholas Coltura, Corporate Communications

Rockridge Resources Ltd.
‎Telephone: 604-558-5847
‎Toll Free: 800-567-8181
‎Facsimile: 604-687-3119
‎Email: info@rockridgeresourcesltd.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

The securities offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any U.S. state securities laws, and may not be offered or sold in the United States or to, or for the account or benefit of, United States persons absent registration or an applicable exemption from the registration requirements of the U.S. Securities Act and applicable U.S. state securities laws. This press release does not constitute an offer to sell or the solicitation of an offer to buy securities in the United States, nor in any other jurisdiction.

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements, including the Private Placement.Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, regulatory approvals, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.


 

Primary Logo